Page 1 of 1

Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 3:05 pm
by Remie Richards
https://github.com/NTStation/NTstation13/pull/552

Taken from the NTstation minor suggestion thread.

Includes a syndie uplink item that grants them knowledge of Door wires for 2 TC (1 TC cheaper than Emag because it requires tools)

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 3:26 pm
by Steelpoint
I like it, you think that of anyone on station the Engineers would know how the Doors and APC's work.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 3:27 pm
by Bluespace
>Knowledge of door wires costs as much as C4.
Make it 1TC.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 3:42 pm
by Remie Richards
Bluespace wrote:>Knowledge of door wires costs as much as C4.
Make it 1TC.
The TC cost was primarily balanced against the Emag, something it shares a function with (Arguably door wire knowledge is more subtle, but requires tools)
I'll see what others say, Right now I have you against 2 TC and Paprika for 2 TC.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 4:29 pm
by Zelacks
2TC is too much, 1TC is almost too much.
Cutting doors to figure out the wires takes two seconds and almost no one will ever arrest for testing for wires, mostly because non antags will need to know the door wires too.

I would say no to it costing 1TC except that 1TC are either jokes or slightly usuable (soap and deck has marginal use, soap being soap and the deck is actually a pile of floor tiles)
Probably okay at 1TC.

Also this is almost breaking core rules, being that no job should really get special traits (mime and clown being sort of exceptions). I am pretty sure errorage suggested something where only people who were signed up as a medic could preform medical tasks, engineers only engineering, which was disapproved and veto'd. Not to mention the removal or never added job specific antag items, eg the ones goon now has

EDIT: I still voted yes because I think its a cool idea personally, though I still suggest it costs 1TC, just personally

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 4:44 pm
by Jeb
A roundstart engineer should know the door/apc wires, because one would think that would be part of their training before actually going to work on the station.

Someone that is sent in as a "fillin" (latejoin) engineer shouldn't know automatically and should either have to ask or figure out on their own.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 5:15 pm
by Remie Richards
Jeb wrote:A roundstart engineer should know the door/apc wires, because one would think that would be part of their training before actually going to work on the station.

Someone that is sent in as a "fillin" (latejoin) engineer shouldn't know automatically and should either have to ask or figure out on their own.
the Memory of the Wires is added during the Equip procs.
Anyone who is an engineer when they arrive on station, knows the wires.
Any engineer assigned by the hop, does not know them by default.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 5:42 pm
by WeeYakk
Isn't this kind of like giving the geneticist knowledge of all power and disability blocks at round start? Worried that this will lead to more yellowtide of people just playing engineer because it's assistant with more access and now door wires.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 5:52 pm
by Tokiko2
WeeYakk wrote:Isn't this kind of like giving the geneticist knowledge of all power and disability blocks at round start? Worried that this will lead to more yellowtide of people just playing engineer because it's assistant with more access and now door wires.
It's the geneticist's job to research the power blocks though. Engineers are supposed to repair the station, not research it's electronic equipment.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 8:42 pm
by Stickymayhem
My roundstart routine as assistant takes about two minutes. I get tools and a belt, grab the arrivals flash and figure out the wires.

I would never bother with this as an antag. Syndie soap is infinitely more useful.

As for the engineer change, it's good I guess. It might possible lead to shittier changes, but this right now just eliminates some busy work.

I kinda like the engineering communication. There is a certain feel to the engee channel of exasperated camaraderie that I really enjoy. I hope it isn't effected by this change, which eliminates a reason to communicate.

Re: Engineers know APC and Door wires at Roundstart

Posted: Mon May 12, 2014 9:36 pm
by miggles
im fine with it, since it takes like 2 seconds to find the wires anyway